A simplified overview — for full installation guides, technical drawings, and spec sheets, contact our team or request a trade account.
Substrate prep
Ensure decking or purlins are clean, level, and fastened to spec. Install underlayment and ice & water shield at eaves, valleys, and penetrations.
Clip layout
Snap layout lines and install floating clips to the substrate at the specified spacing — typically 12″ to 24″ o.c. depending on wind zone and gauge.
Panel installation
Set panels into clips from eave to ridge, interlocking each seam before clipping. Run panels full length to avoid end laps wherever possible.
Mechanical seaming
Using a mechanical seaming tool, lock all panel seams in a continuous pass from eave to ridge. This step creates the watertight lock that gives standing seam its performance.